FOB Price
أحصل على آخر سعر3 ~ 9 / Piece ( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
100 Piece
Packaging Detail:
by Pallet, 12 PCS to 1 Small CTN
Delivery Time:
15-20 days after advance T/T
Supplying Ability:
7500 Piece per Month
Payment Type:
D/P, L/C, T/T
الشخص الذي يمكن الاتصال به Mr. Eric
weimin road, xinqiao town, danyang city, Zhenjiang, Jiangsu
1, It is a cost-efficient and reliable solution in HPS lighting.
2, Equipped with sintered alumina discharge tube and clear tubular outer bulb.
3, Energy-saving, high luminous efficiency.
4, May work with a step-dim ballast to for smart energy saving.
5, Suitable for dock, stock house and city road lighting.