FOB Price
أحصل على آخر سعر( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Ton
Packaging Detail:
Bare packing/bundle packing/wooden carton packing
Delivery Time:
30-60days after received your deposit
Supplying Ability:
4600 Ton per Month
Payment Type:
T/T, L/C
الشخص الذي يمكن الاتصال به Ms. Anny
No.478 SongShan Road New District Suzhou, Changzhou, Jiangsu
Cold drawn seamless carbon steel tube for Boiler and Heat Exchanger
Grade and Chemical Composition (ï¼…) | ||||||
Grade | C | Mn | P | S | Si | Mo |
T1 | 0.***0.*0 | 0.***0.*0 | 《0.**5 | 《0.**5 | 0.***0.*0 | 0.***0.*5 |
T1a | 0.***0.*5 | 0.***0.*0 | 《0.**5 | 《0.**5 | 0.***0.*0 | 0.***0.*5 |
T1b | ≤0.*4 | 0.***0.*0 | 《0.**5 | 《0.**5 | 0.***0.*0 | 0.***0.*5 |
Mechanical Properties(MPa): | |||||
Grade | Tensile Point | Brinell Hardness Number | Rockwell Hardness Number | ||
T1 | ≥**0 | 《**8HRB | 《*0HRB | ||
T1a | ≥**5 | 《**3HRB | 《*1HRB | ||
T1b | ≥**5 | 《**7HRB | 《*7HRB |
DIMENSIONS | SIZE | MOQ | MATERIAL | PACKAGE | OTHER |
Standard:ASTM/ASME A**9 Steel : T1/T1a/T1b |
Out Diameter: *9.*****8mm Wall thickness:***0mm Max length: *6m |
1Ton | Steel : T1/T1a/T1b | Bare packing/bundle packing/wooden carton packing | Capacity: ***0ton/month Delivery: ****0days after received your deposit Payment: T/T or L/C |