Description
My link with this projects are very genuine i GUARANTEE TO YOU
***0%, I have an Electric Train (LRT) project which already been
approved by the Malacca state government on *4 April ***4 . This is
the first private company that have a development order from sate
of malacca to build own operate Electric Train (LRT) project in
Malaysia, Malacca state is a tourist destination The train will
start from Kuala Lumpur International Airport (KLIA ) to Malacca
state which the distance is about **0 km.It will consist of 2
terminals and *8 stations. Beside this we will do a japan
technology power turbine which can produce electricity from sea
water to generate power for this Electric Train.
We will also develops some potential areas a long the railway track
as pocket development . The total cost of this projects is
estimated USD 1.5 - 2.0 Billion . The conservative revenue
estimation is USD **0 - **0 million per year.
we must submit the master plan and feasibility study before the
construction starts. This project is Private Funding Initiative ,at
the moment we need USD *0 million to do the master plan and
feasibility study. Now , i need your assistance how to fund this
projects a.s.a.p and we need fast approval.. if you interested we
can have meeting direct with project owner my CEO, we can show all
the details project paper and approval..
Below summary of the project :-
• Malacca City (via the coastal line) to
KLIA Sepang (Airport Hub) through Sepang and Port Dickson town and
estimated total distance is about **0km.
• (Note: The proposed alternative from
Melaka City to KLIA via Seremban - PD)
• Has 2 main terminals and *8
stations ,train will en route by existing roadside reserve between
Malacca, Negeri Sembilan and Selangor state.
• The selective terminal station will
include other supporting development or pocket development to
capture the economic spin and to increase the potential of
development spill over.
• One main terminal in Malacca will
support the "Malacca Gateway" site directly from KLIA as
complementary to public amenity infrastructure.
• Each train is equipped with **6
coaches designed with green and environmentally friendly.
• Each coach has a maximum passenger
capacity of **0 **0 people at one time.
• Train is medium speed High-tech
electrical train either from Europe , China or Korea
• Medium-speed MRT trains with the
maximum speed of **0km per hour and Monorail with the maximum speed
**0km per hour
• Travel from Kuala Lumpur International
Airport (KLIA 1 and 2) to Melaka City via Seremban City will take
within 1 hour *0 minutes
• The electric train will be supported
by own source of electrical power Turbine Generator in selective
sport. This plant will use seawater conversion to produce
electricity power.
• Estimated cost of the project is USD 2
billion
Another integrated real estate development or "pocket development"
at Klebang Beach front will attract another tourist sport and
leisure activities inclusive the hotel , Resort , residential,
commercial and historical theme park that will offers great
opportunities for small and medium businesses as well as
employments and investments.
Thank You
Raziman Azmi
Personal Assistance to CEO
***********2