يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا.
انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Precision Casting---Railway Parts

Precision Casting---Railway Parts

( Negotiable )

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

1 Piece

Packaging Detail:

Wooden Carton

Delivery Time:

15 days

Supplying Ability:

1000 Piece per Week

Payment Type:

T/T, L/C

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Ms. Judy

No. 223 Gongnong Road, Dadong District, Shenyang, Liaoning

الاتصال الآن

Description

It is manufactured by casting, with additional machining and riveting of wear-resistant plates. Side frame, drawing No.**0.*0.****4SB, represents a major piece of a freight wagon bogie, which transmits the load on the axle through the axle box. Cast alloy steels *0GFL and *0GL.

Bolster drawing No.**0.*0.****6 serves as a bridge between the two side frames in the construction of a freight wagon bogie.To ensure reliability and durability the bolster is casted from steel *0GFL or *0GL.One of the main frame details of a bogies framework model No.*****0. Set lifetime of a bogie frame before a bolster discarding is *0 years.

The designated lifetime up to the first depot repair is 2 years, before the first overhaul is 8 years. Established time to failure is at least 2 years.

Overall dimension: side frame:2.*1m***0cm**6cm weight:**0kg

bolster:2.*1m**9.5cm**7cm weight:**5kg

Send a direct inquiry to this supplier

إلى:

Ms. Judy < Shenyang Ruifeng Hardware Co >

أريد أن أعرف: