يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا.
انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
High-strength, High-precision Shock Tube Detonator

High-strength, High-precision Shock Tube Detonator

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

1 Twenty-Foot Container

Packaging Detail:

-

Delivery Time:

7-15 Days

Supplying Ability:

500 Twenty-Foot Container per Month

Payment Type:

T/T, L/C

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Sylvia

No.118, East Dongfeng Road, Panlong District, Kunming, Yunnan

الاتصال الآن

Description

High-strength, High-precision Shock Tube Detonator

1.Performance:
Item Performance
Jolt test No explosion, structural loose or damage after vibrating for *0mins in the vibration machine
Initiating power Use detonator No.4 to fire through 3mm thick lead plate, orNo.8 to fire through 5mm thick lead plate, and the diameter of the hole is bigger than the out-diameter of the shell
Oil resistance Immersed in 0#diesel at *5℃ under 0.3Mpa for *4hrs, put out and initiate, no misfire or incomplete explosion
Tensile Surface detonator Pull with *9.6N static forces for 1min, shock tube can not be pulled out
In-hole detonator Pull with *8.4 N static forces for 1min, shock tube can not be pulled out
Water resistance Surface detonator Immersed in 1m deep water for 8hrs, performance doesnt change
In-hole detonator Immersed in *0m deep water for *0hrs, performance doesnt change








2.Technical index:
Specification: Industrial No.4, No.8
Shell: ODΦ7.1mm、Φ6.9mm
Shell: Aluminum alloy, steel
Length of shell: *0~*0mm
Length of shock tube: Can be ensured according to the requirements of customers
Surface deto. delay time listed as below:
Segment 1 2 3 4 5 6 7 8
Delay time 9ms *7ms *5ms *2ms *5ms **0ms **0ms **0ms
Inhole deto. delay time listed as below:
Segments Delay time(ms)  
Segments
Delay time(ms)
1 *5 *6 **0
2 *0 *7 **5
3 *5 *8 **0
4 **0 *9 **5
5 **5 *0 **0
6 **0 *1 **0
7 **5 *2 **0
8 **0 *3 **0
9 **5 *4 **0
*0 **0 *5 **0
*1 **5 *6 **0
*2 **0 *7 **0
*3 **5 *8 **0
*4 **0 *9 **0
*5 **5 *0 ***0
 




3. 3. 3.Application :
Can be used in underground mine or open blasting workplace without dangers of mashgas and mineral dust,and can be widely used in the medium deep holes blasting of onsite loading truck field work.

Send a direct inquiry to this supplier

إلى:

Sylvia < Kunming Tengyuehao Trade and Economy Co., Ltd >

أريد أن أعرف: