FOB Price
أحصل على آخر سعر400 ~ 950 / Metric Ton ( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
10 Metric Ton
Packaging Detail:
in bulk or in bundle or as the customers' requirements.
Delivery Time:
ithin 7 to 30 working days after receipt deposit
Supplying Ability:
500 Metric Ton per Month
Payment Type:
D/P, D/A, L/C, T/T, Western Union
الشخص الذي يمكن الاتصال به Aimee
Tianjin, Tianjin
Standard: JIS/ ASTM/ GB/ BS/
Length: 5.8m, 6m, *2m, or as the customers\'requirements.
Usage:
1.used for the plant, high-rise building construction
2.used for the bridge, shipment building
3.used for lifting and transportation machinery, equipment manufacturing base building
4.used for the support, foundation pile manufacturing
company information
:
Tianjin Erf metal structure co., LTD. (subordinate KaiLongGang structure co., LTD) is a positive response to the national development and environmental protection, energy-saving and efficient steel structure industry, and was engaged in steel structure of the system design, research and development, production and installation of professional firms.
Global recruitment of agents, distributors, wholesalers ; Undertake ODM & OEM orders.
Sincerely expect your joining and cooperation for the mutual win-win business !
*4 Hours hot Line:**************5
Contact us
Tianjin Erf Metal Structure Co., Ltd.
Lanyuan Road, Xiqing Dist., Tianjin, China (Mainland)
Tel : **6 **********6
Fax : *6 **********6
Moveable : *6 ***********5
Skype : live:*********9
Aimee Cui