FOB Price
أحصل على آخر سعر|
Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
الشخص الذي يمكن الاتصال به Ms. billy
luofeng2, Wenzhou, Zhejiang
The time of replacing debugging mold | **8mins(for beginners) |
Production rate | **2.5 ten thousand/hour(depending on capsules No.) |
Applicable capsules | **0#,*0L#,*0#,0#,1#,2#,3#,4#,Mechanism standard capsules |
Filling material | Without a sticky and wet powder,small granules |
Total power | 4.0kw |
Air pressure | 0.*3m^3/min 0.6Mpa |
Vacuum pump | Pump capacity is *0m^3/h |
Machine dimension | ***0***0****0mm |
Packing dimension | ***0***0****0mm |
Net weight | **0kg |
Gross weight | **0kg |