FOB Price
أحصل على آخر سعر360 ~ 350 / Long Ton
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
50000 Metric Ton
Packaging Detail:
Drums
Delivery Time:
25 to 30 days
Supplying Ability:
300000 Metric Ton per Month
Payment Type:
T/T, L/C
Malaysia
الشخص الذي يمكن الاتصال به Aprila
ORIGINE: Russian Federation
Delivery: CIF ASWP with rollover & extension.
Price: Gross USD **0/Mt, Net USD **0/Mt
Maximum quantity: **0,**0 MT/Monthly
Inspection: SGS test report will be conducted at loading port.
PAYMENT INSTRUMENT: DLC/ SBLC/ IRDLC/ BG/ T/T/, MT**3, at Sign.
LOADING PORT : Vladivostok/ Nakhodka port.
SHIPMENT METHOD: Via vessel.
PERFORMANCE BOND (PB): 2% to be issued by sellers banks in favour
of the seller.
CIF SELLING PROCEDURE
1. Buyer send LOI/ICPO to seller
2. Seller will revert with Draft Contract addressed to buyer
company along with the NCNDA for all intermediaries.
3. Buyer sign each page of full contract and return to
seller.
4. Seller pays for registration and legalization of the full
draft contract to the Russian Ministry of energy.
5. Seller must send the Notarize partial POP to buyer through
secured courier service.
ï¶ Certificate of origin.
ï¶ Refinery registration certificate
ï¶ Statement of product availability
ï¶ Export license.
ï¶ Commitment to produce the product.
ï¶ Attestation of allocation certificate.
ï¶ Bill of loading/ Q*8.
ï¶ Analytical report equivalent.
6. Upon the confirmation of the listed PPOP buyer bank swift
stand by letter of credit (DLC or SBLC conditional.
7. After the confirmation of the buyer payment instrument,
seller will issues to buyer bank the full shipment documents POP
plus 2% PB, via swift bank to bank. Upon acceptance of buyer
payment instrument (DLC or SBLC) covering the first trial shipment
by seller.
8. The SGS inspection will be borne by seller at the
loading port and buyer at the offloading port.
9. Shipment commences as per contract.
*0. Buyers bank upon arrival of the cargo at the discharge
port, payment will be made for the product by the buyer via MT**3
**0% after SGS inspection at discharge port
*1. Seller will release payments to the intermediaries
involved within *8 hours of receiving the payment for the product
from buyer bank signed.