FOB Price
أحصل على آخر سعر( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
-
Delivery Time:
180 days
Supplying Ability:
2 Set per Month
Payment Type:
Western Union, L/C, T/T
China
الشخص الذي يمكن الاتصال به Ms. Aisha
ACME Park, MuYun Industrial Zone, Changsha, Hunan
SpecModel | PSF******2 | PSF******3 | PSF******8 |
Working Zone Size (WHL)(mm) | **0 **0 ***0 | **0 **0 ***0 | **0 **0 ***0 |
Max. Weight (kg) (not mean actual load weight) | **0 | **0 | **0 |
Max.temperature (C) | ***0 | ***0 | ***0 |
Temperature uniformity under vacuum (C) | 5 | 5 | 5 |
Temperature uniformity under pressure (C) | 7.5 | *0 | *0 |
Heating power of Pressure sinter-hip furnace (kW) | **0 | **0 | **0 |
Ultimate Vacuum (Pa) | 2 | 2 | 2 |
Pressure Increase Rate (Pa/h) | 0.*7 | 0.*7 | 0.*7 |
Working pressure | *0/*0/**0 | *0/*0/**0 | *0/*0/**0 |
Process gas (bar) | Ar/N2/H2/CH4 | Ar/N2/H2/CH4 | Ar/N2/H2/CH4 |
The above specifications are defined according to cemented carbide part. The above parameters can be adjusted to the process requirements, they are not as acceptance standard, the detail spec. will be stated in the technical proposal and agreements. |