FOB Price
أحصل على آخر سعر1000 ~ 2000 / Unit ( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
1 Unit
Packaging Detail:
Wooden packing
Delivery Time:
1 TO 30 DAYS
Supplying Ability:
129 Unit per Year
Payment Type:
T/T
Tunnel oven | ||||||
model | tray size | kind | inner hall width | outside width | power | normal consumption |
MY*1 | **0***0mm | electric | ***0mm | ***0mm | ****0kcal/m | ***0kcal/m |
MY*2 | **0***0mm | electric | ***0mm | ***0mm | ****0kcal/m | ***0kcal/m |
MY*3 | **0***7mm | electric | ***0mm | ***0mm | ****0kcal/m | ***0kcal/m |
MY*4 | **0***0mm | electric | ***0mm | ***0mm | ****0kcal/m | ****0kcal/m |
MY*5 | **0***0mm | electric | ***0mm | ***0mm | ****0kcal/m | ****0kcal/m |
MY*6 | **0***0mm | electric | ***0mm | ***0mm | ****0kcal/m | ****0kcal/m |
MY*7 | **0***0mm | gas | ***0mm | ***0mm | ****0kcal/m | ***0kcal/m |
MY*8 | **0***0mm | gas | ***0mm | ***0mm | ****0kcal/m | ***0kcal/m |
MY*9 | **0***7mm | gas | ***0mm | ***0mm | ****0kcal/m | ***0kcal/m |
MY*0 | **0***0mm | gas | ***0mm | ***0mm | ****0kcal/m | ****0kcal/m |
MY*1 | **0***0mm | gas | ***0mm | ***0mm | ****0kcal/m | ****0kcal/m |
MY*2 | **0***0mm | gas | ***0mm | ***0mm | ****0kcal/m | ****0kcal/m |