يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا.
انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
long reach boom and arm of excavator

long reach boom and arm of excavator

( Negotiable )

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

1 Unit

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

-

Payment Type:

T/T

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Ms. Melanie

Yanglang Road,Yangwu Community, Yichun, Jiangxi

الاتصال الآن

Description

1.   Long reach boom are use for dredging rivers port construction, railway construction and groundwork construction, with high extensive operation scope, high efficiency and high security.
2.   We have over *0 years experience in designing and customize the long reach boom for all brand excavators.
3.   Applicable for all the excavator model,OEM service is also available.
4.   Advanced manufacturing process, Technique is in the line with global standards.
5.   We have all the installation dimensions of most excavator, we can customize this long reach boom for your excavator.
6.   The main material of this long boom is Q**5B + Q**0.
7.   The long reach boom include lubricant pipe system, hydraulic system, 1 bucket, 1 bucket cylinder, 1 linkage, 6 pins and 4 hoses.
8.   Before welding, we have use big edge milling machine mill(taper process) the edge of the sheet. So the welding can go to the internal of the steel-sheet and make the structure have higher performance. Also the inside have strength plate make it more stronger.
9.   If necessary, extra pipeline can be added to suit to some extra application.
*0. Stick cylinder of the long boom, can use your original stick cylinder to save the cost, if you need the stick cylinder, we also can prepare for you.
*1. Some parts can be consolidated using thicker plate or overlapping another plate  for heavy-duty application.
*2. Welding is protective-gas welding, the protective gas is *0% Argon and *0% CO2 mixed. This is golden standard for protective gas. 
*3. Before welding, we have use big edge milling machine mill the edge of the sheet. So the welding can go to the internal of the steel-sheet and make the structure have higher performance.
*4. For all base,joint and other main structure of the long boom, we use boring machine adjust the precision after welding, to avoid the welding-stress leading to big tolerance.
*5. The manufacture time about *5 days. Warranty time 9 month after installation.
*6. We will also supply parts list for the long reach boom, so it's easy for Maintenance and after-sales service.

 

Send a direct inquiry to this supplier

إلى:

Ms. Melanie < Bozhida Engineering company >

أريد أن أعرف: