يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا. انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Pressure flow mixed flow fan

Pressure flow mixed flow fan

100 ~ 1000 / Piece ( Negotiable )

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

1 Unit

Packaging Detail:

carton

Delivery Time:

10-20days

Supplying Ability:

1000 Unit per Month

Payment Type:

Western Union, L/C, T/T

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Selina

Dezhou, Hubei

الاتصال الآن

Description

CHARACTER

Mixed-flow fan is a new type of fan between centrifugal and axial flow. It has higher pressure and larger air volume than the same number of centrifugal fan. It has the characteristics of high efficiency, wide efficiency area, low noise, compact structure and convenient lamp installation. It is widely used in the air supply and exhaust system of industrial and mining enterprises and high-rise buildings.



TECHNICAL
 

Flow: Mixed-flow fan
Total pressure:  oem
Rotating speed:  oem
Medium temperature:  oem
Ambient temperature:  oem
Intake pressure:  oem
The scope of the product: ****0 Square meter
Moq:  *0



FAQ

Q1: How to order your product ? 

A1:Please tell us the model and quantity and other requests you need.



Q2: Could I buy a sample before placing the order. 

A2:Yes,It is ok. Welcome to your samples orders.



Q3: What is your payment terms?

A3: Payment terms vary among different countries. Generally, *0% T/T in advance, *0% balance before shipment.

 

Q4: Can I use my own LOGO design on goods?

A4: Yes, customized logo and design on mass products are available.(It can't constitute infringement)

 

Q5: Can I customized the products?

A5: Yes, customization is available.

 

Q6:  What is the lead time after placing the order?

A6:  Normally, it takes about **2 weeks after your order. However, it would depend on our production line schedule and the complexity of the item.

Engineering is about **3 Months after receiving your confirmation.



Q7:  Do you test all your goods before delivery?

A7:  Yes, we have **0% test before delivery.

Send a direct inquiry to this supplier

إلى:

Selina < Dezhou Winifred IMPORT >

أريد أن أعرف: