يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا.
انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
axial flow fan

axial flow fan

100 ~ 1000 / Piece ( Negotiable )

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

1 Unit

Packaging Detail:

carton

Delivery Time:

10-20days

Supplying Ability:

1000 Unit per Month

Payment Type:

Western Union, L/C, T/T

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Selina

Dezhou, Hubei

الاتصال الآن

Description

APPLICATION:

Ventilators are widely used in ventilation, drainage and cooling of factories, mines, tunnels, cooling towers, vehicles, ships and buildings; ventilation and draft in boilers and industrial furnaces; cooling in air conditioning and domestic appliances and Ventilation; grain drying and selection; wind tunnel source and hovercraft inflatable and propulsion.

ADVANTAGE

1. Compact structure. 

2. Various material for different usage condition & situation: Mile steel, Stainless Steel #**4/#**6/#**6L, Aluminum Alloy.

3. Transport gas temperature at **0ºC ~ **0ºC.





FAQ



Q1: How to order your product ? 



A1:Please tell us the model and quantity and other requests you need.







Q2: Could I buy a sample before placing the order. 



A2:Yes,It is ok. Welcome to your samples orders.







Q3: What is your payment terms?



A3: Payment terms vary among different countries. Generally, *0% T/T in advance, *0% balance before shipment.



 



Q4: Can I use my own LOGO design on goods?



A4: Yes, customized logo and design on mass products are available.(It can't constitute infringement)



 



Q5: Can I customized the products?



A5: Yes, customization is available.



 



Q6:  What is the lead time after placing the order?



A6:  Normally, it takes about **2 weeks after your order. However, it would depend on our production line schedule and the complexity of the item.



Engineering is about **3 Months after receiving your confirmation.







Q7:  Do you test all your goods before delivery?



A7:  Yes, we have **0% test before delivery.

Send a direct inquiry to this supplier

إلى:

Selina < Dezhou Winifred IMPORT >

أريد أن أعرف: