FOB Price
أحصل على آخر سعر50 ~ 2000 / Unit
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
10 Ton
Packaging Detail:
BY PALLET
Delivery Time:
40-65days
Supplying Ability:
1000 Ton per Month
Payment Type:
T/T
الشخص الذي يمكن الاتصال به Elsa
Jinshanqiao economic & development zone, Xuzhou, Jiangsu
ductile iron pipe fittings
1. Standards : ISO***1, EN**5 , EN**8 , BS***2 .
2. material : DI GGG****7 or other Ductile iron .
3. coating : Fusion bonded epoxy coating ;
cement lining inside and zinc primer and bitumen painting outside ;
bitumen painting inside and outside ; red anti-rustcoating .
4. package : wooden cases or wooden pallets with plastic layer , or according to customers' requirement.