FOB Price
أحصل على آخر سعر20000 ~ 300000 / Set ( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
no packing
Delivery Time:
60 days
Supplying Ability:
5 Set per Month
Payment Type:
T/T, L/C, Money Gram
الشخص الذي يمكن الاتصال به Mr. Shing
Zhenggang Road, Cangzhou, Hebei
Model | **0x*0mm | Date | *0th Jan | Term of validity | *0 days | Lead time | *0 Days | |
Size L*W*H m | Weight | T | Working scope | Can Push carbon steel elbow with max diameterФ**0x*0mm (*6" x *0mm) | ||||
Cost (EXW) |
Wed like to assist to handle the export and to deliver the goods to Tianjin Xingang port, The buyer pay us for all the charges. | |||||||
The
MainTechnicalParameters of The
Machine 1 Theoil cylinder: Ф**0mm, the effective trip:6.5m, pressure:*1Mpa, 4 bars The maximum thrust of the 4 cylinders: **0tons; The forward speed: 0—*0cm/min , The max backward speed: **0cm/min. 2 Thepump station: *3scy-plunger pump :3 sets, *8.5KW Motor: 3sets (themain working pump) CB***0 gear pump: 1 set,*5KWmotor: 1set (for fast forward and back) CB**6gear pump: 1 set,5.5KWmotor: 1set (for the fork gate) The hydraulic valve is integrated oil rout, hydraulic front and back gate.Automatic feeding. 3. Theframe for the main engine: *0# channel steel, welded with *3kg steel rail 4 Thepanel for the main engine: welded with *0mm medium plate 5 Distribution cabinets, operation box1 set 6 Intermediate-frequency power (power**0KW **0vã€**0vã€*0Hz) 7 the maxpipe can be feed each time : 2 pieces |
||||||||
The
scope of supply A. frame for the main engine: 1piece, hydraulic pump station: 1 set, distribution box 1set, front andback fork door: 1block each .
|
||||||||
The
purchasershould prepare a. power,wire and cable connecting the equipment b. terra screws, cement floor c. water cooling section (pool, water pump, water pipes, etc.) d.hydraulic oil, the die, the reforming equipment. |
||||||||
After-sales
service When the machine arrive your factory, the water, electric prepared well, then we would send our technician to direct to install until the machine works.(accommodation supplied by the buyer and the buyer should offer the installing tools.) We are responsible for the repair in one year after the machine out of our factory, in the first 6 months free for all (except the human factors); in the last 6 months, the buyer would bear the payment of the parts, we repair for free. |
||||||||
Payment terms |
30% advance payment by T/T
beforethe production, *5% by T/T before goods delivery. 5% by T/T after installation and commissioning. |