سعر فوب
أحصل على آخر سعر( Negotiable )
|1 Set Minimum Order
بلد:
China
نموذج رقم:
Mola-B-S5
سعر فوب:
( Negotiable )أحصل على آخر سعر
الموقع:
chongqing
سعر الحد الأدنى للطلب:
-
الحد الأدني للطلب:
1 Set
تفاصيل التغليف:
Cartons
موعد التسليم:
Within 15 days
القدرة على التوريد:
300 Set per Month
نوع الدفع:
T/T, L/C
مجموعة المنتج :
الشخص الذي يمكن الاتصال به Nancy
é‡åº†æ±ŸåŒ—区åŽæ–°è¡—, Chongqing, Chongqing
Specification
1.Biogas equipment
2.Long service life
3.Low maintenance cost
4.Environment-friendly
The Biogas Plant of
double diaphragm is made of high-strengthened, high-elastic
synthetic engineering diaphragm and of perfect anti-acid and
anti-corrosion ability. Its capacity of absorbing the ambient heat
and storing it is *0% higher than that of other
material.
The Biogas Plant is made by adopting technology of combining
internal digester and external protector. In this way ,it not only
minimizes the possibility of doing damage to the internal digester,
prolong its lifespan, and also create an complete Oxygen-free room
for anaerobic micro organisms to do fermentation, which in return
increases the Biogas Output ratio.
Product
parameter
Advantage
1.Economic and durable, low price,
less investment
2.Light weight, folding, small
volume, convenient transportation and carrying
3.The technology of the whole
equipment series can also be customized
4.Health environmental protection,
no pollution
5.The equipment is very
safe
6.Installation is simple and
quickp;
After-sale
guide
Try our EASY FIXES before calling a technician
Has the biogas stopped?
• Check the level of the top drum to see if there is biogas.
• Check your phone for a message that your biogas credit has run
out.
Is the stove flame low or is the lamp dim?
• Make sure all valves are fully open.
• Check the level of the top drum to see if there is biogas.
• Make sure that fresh dung has been loaded.
• Check all hosepipe for kinks.
• Make sure the appropriate weight is on top of the digester.
Is the biogas system overflowing from the sides?
• Check the outlet valve for blockages and clean out any dried cow
dung.
Is the dung not going into the biogas system?
• Make sure the outlet is clear
• Try to load it again in 5 hours or when the top drum rises 1
foot.
Are you having trouble paying for
biogas?
• Call Takamoto Biogas ***********8. We are open Monday to Friday
9am to 5pm.
Are you still having a problem?
• If you have tried our quick fixes but are still having a problem,
call Takamoto Biogas ***********8. We are open Monday to Friday 9am
to 5pm.
بلد: | China |
نموذج رقم: | Mola-B-S5 |
سعر فوب: | ( Negotiable ) أحصل على آخر سعر |
الموقع: | chongqing |
سعر الحد الأدنى للطلب: | - |
الحد الأدني للطلب: | 1 Set |
تفاصيل التغليف: | Cartons |
موعد التسليم: | Within 15 days |
القدرة على التوريد: | 300 Set per Month |
نوع الدفع: | T/T, L/C |
مجموعة المنتج : | biogas plant |