الوصف
1.Application For the partial or permanently underwater steel
structure, the internal cabin of crude oil, chemical plants, sewage
treatment pond, water supply pipes, underground pipeline and steel
tanks in the oil refineries, oil gas pipe etc. 2. Features Be with
excellent anti-corrosion, water resistance, and good eroding
capable of the micro-organisms. It can be filmed one time, less
construction steps. The excellent anti-corrosion properties of
rubber modified, make it with the physics mechanical properties,
electrical insulation properties and other relative properties
better. ***** 1.Preparation: First, mix fully to no sediments on
the bottom of barrel. Then, add side hardener into coating as
*0:1(weight rate). It is ready for use *0~*5 minutes later.
2.Surface cleanness: Cleanness to national standard Sa2½ for metal
structure. Or derust to St3 by hand, or chemicals to no grease, no
rust, no litter, dry and clean. Do paint primer within 4 hours.
***** point for attention: 1. There is no edges, no weld, no burr
and smooth on surface weld. Coat putty of good viscosity with
primer and talc on both side of weld to transition in order to
avoid the vaccum while wrapping glass-cloth, if the weld is higher
than 2mm. 2. Do not add the thinner, while spreading coating thick.
Add 1%~5% thinner, and some hardener unless temperature is too low
and viscosity is too thick. 3.Do not take construction in rain,
fog, snow and relative humidity≥*0%. 4. 0.1mm and 0.*2mm is the
right thickness for glasscloth, and transit density is
*2×*0posts/cm³ or *2×*2posts/cm³. The humidity glasscloth
should be dry at first. *****: Bridge between broken coating and
pipe coating is not less than **0mm, and its surface treatment is
up to be clean St3. 6.Broken coating: Wipe out the broken coatings.
Intermediate coating only and topcoat web of glasscloth fully, if
base is not apperanced.
بلد: |
China |
نموذج رقم: |
XHDAC210
|
سعر فوب: |
3700 / (قابل للتفاوض)
أحصل على آخر سعر
|
الموقع: |
Sichuan |
سعر الحد الأدنى للطلب: |
3700 |
الحد الأدني للطلب: |
2Ton |
تفاصيل التغليف: |
- |
موعد التسليم: |
- |
القدرة على التوريد: |
500Ton |
نوع الدفع: |
- |
مجموعة المنتج : |
- |