يبدو أنك لست عضوًا في TradeKey.com بعد. اشترك الآن للتواصل مع أكثر من 7 مليون مستورد ومصدر عالميًا.
انضم الآن ، مجانًا |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Epoxy Primer
Next

Epoxy Primer

|

3Ton Minimum Order

بلد:

China

نموذج رقم:

XHDAC302

سعر فوب:

أحصل على آخر سعر

الموقع:

Chengdu

سعر الحد الأدنى للطلب:

-

الحد الأدني للطلب:

3Ton

تفاصيل التغليف:

-

موعد التسليم:

-

القدرة على التوريد:

500Ton

نوع الدفع:

-

مجموعة المنتج :

-

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Ms. Yu

Chuangye Road, Chengdu, Sichuan

الاتصال الآن

الوصف

1. Application For anti-rust primer and workshop primer on steel surface, also on bridge, vessel, facilities of harbour and coal mine, underwater coating, sea equipment, interior and exterior of the oil tank and other areas. 2. Features 1. Interpenetrating network anti-corrosive coating to keep the coating from powder and improve the coating weather resistance. 2. Excellent coating film is with good cathode protecting and conduction of electricity, also with strong adhesion, weather resistance, water proofing and others. 3. Convenient to construction and solidification at room temperature. ***** 1.Preparation: First, mix fully to no sediments on the bottom of barrel. Then, add side hardener into coating as *0:1(weight rate). It is ready for use *5~*0 minutes later.And the best to do a trial about hardener. 2.Surface cleanness: Cleanness to national standard Sa2½ for metal structure. And keep it dry. Do paint primer within 4 hours. 3.Usage: Please use up the prepared primer within 3 *(@******************** should be not re-add into the primer. *****: Dry thickness at one time is about *5µm by high pressure no-gas spraying and gas spraying, about *0µm by hand brushing. 5. Comsuption in theory: Without consideration of coating environment, method, technology, surface and its structure, shape, and area, its comsuption is generally acceptable as 0.*4kg/m². 6.Advice application: For flat film, the better is to take as high pressure no-gas spraying, then gas spraying, hand brushing. 7. Thinner comsuption: Add XHDAC**2 thinner if the coating is too thick, as 1~5%. 8. Tools Cleanout: Use our XHDAC**9 cleaning agent, or XHDAC**2 special thinner, please. 9. Maintenance: It should take 7~*0 days to work after coating the last topcoat. Delay some days once temperature is under *0 ℃. 4. Package: Packed in iron drum, net weight: *0kg per drum, but thinner is *5kg per.

بلد: China
نموذج رقم: XHDAC302
سعر فوب: أحصل على آخر سعر
الموقع: Chengdu
سعر الحد الأدنى للطلب: -
الحد الأدني للطلب: 3Ton
تفاصيل التغليف: -
موعد التسليم: -
القدرة على التوريد: 500Ton
نوع الدفع: -
مجموعة المنتج : -

منتجات ذات العلاق Sichuan Auspicious Coatings Co.LTD

Send a direct inquiry to this supplier

إلى:

Ms. Yu < Sichuan Auspicious Coatings Co.LTD >

أريد أن أعرف: