Full tail sand dry-discharge cementing filling process
Next

Full tail sand dry-discharge cementing filling process

|

- Minimum Order

بلد:

China

نموذج رقم:

-

سعر فوب:

أحصل على آخر سعر

الموقع:

-

سعر الحد الأدنى للطلب:

-

الحد الأدني للطلب:

-

تفاصيل التغليف:

-

موعد التسليم:

-

القدرة على التوريد:

-

نوع الدفع:

-

مجموعة المنتج :

-

الاتصال الآن
عضو مجاني

الشخص الذي يمكن الاتصال به Ms. Saffi

Building A 806, Yinhe Plaza, High-teach Zone,, Jinan, Shandong

الاتصال الآن

مواصفات المنتج

الوصف

Full tail sand dry-discharge cementing filling process

Process introduction:

Full tail sand dry-discharge cementing filling process refers to that after cyclone classification and thickening, the full sand with a certain concentration will be dry-discharged to dry stockyard as aggregate, and then be mixed with cementation material to prepare filling slurry for conveying to underground. Cementing filling deep hole mining method, designed by our company for Shandong Zibo Jinding Ore Mining Co.,Ltd Wangwangzhuang Iron Mine, takes the full tail sand of Jinling iron mine tailing storage as filling material, the cementation powder produced by our company with independent intellectual property rights as the cementing material. The full sand will be conveyed by belt conveyor and metered by electronic belt scale, while the cementation powder will be stored in material silo, conveyed and proportioned by screw conveyor and screw metering scale. The filling system adopts two-stage stirring composed by double-shaft stirrer and high-efficient activation stirrer. The prepared filling slurry will flow naturally to the filling area through filling drilling and laying pipeline.

Technical innovation: 

In order to make pipeline conveying convenient, reduce pipeline flow resistance and improve slurry suspension property, the full tail sand dry-discharge cementing filling process will select reasonable concentration and grain size distribution. 

Two- stage stirring slurrying composed by double-shaft stirrer and high-efficient activation stirrer can break the flocculent structure in slurry, improve the activation property, and make the slurry possess good liquidity and relatively low segregation rate.
    
It solves the problem of selecting reasonable concentration for filling slurry by making full use of our two-phase flow loop lab.
    
It adopts the new-type cementing filling material with self-developed and independent intellectual property. Under the same strength requirement, the amount of cementing material is 2/3 of that of cement, which can reduce the filling cost.

   Central control system adopts WinCC human-computer interface, which can carry out remote commissioning and system maintenance through network.

بلد: China
نموذج رقم: -
سعر فوب: أحصل على آخر سعر
الموقع: -
سعر الحد الأدنى للطلب: -
الحد الأدني للطلب: -
تفاصيل التغليف: -
موعد التسليم: -
القدرة على التوريد: -
نوع الدفع: -
مجموعة المنتج : -

Send a direct inquiry to this supplier

إلى:

Ms. Saffi < Shandong Huifa Mining Technology Co., Lt >

أريد أن أعرف: