الوصف
1.Operation skills
a. Check the lubricating
condition of the bearing and the amount of the grease between the
bearing and bracket before the power is on。
b. Check the state of all the
fastener carefully .
c. Check the condition of the
rotating belt .The broken belt should be changed at once and the
greasy dirt should be wiped out with clean rag ,if found on the
belt or the belt pulley .
d. Check if there is ore or other
sundries in the crushing cavity .If so, they should be eliminated
.
e. Materials can be feed once the
machine functions well .
f. The crushing materials should
come into the cavity evenly .Feeding side should be avoided
preventing the sudden load change or sudden increase on one
side
G. Under the normal condition
,the temperature of the bearing should not be over
*5℃.The machine should
be stopped at once if it is over *5℃ and we should find out the
cause then eliminate it .
H .Materials should be stopped
feeding before the power is off .And the machine can be shut off
unless all the materials are discharged out .
I. In crushing ,the
electronic machine should be shut off under this condition that
the machine stopped because of the materials jam in the crushing
cavity .And Unless the materials are eliminated the machine can
be open again.
بلد: |
China |
نموذج رقم: |
ll-000
|
سعر فوب: |
(قابل للتفاوض)
أحصل على آخر سعر
|
الموقع: |
zhengzhou Henan China |
سعر الحد الأدنى للطلب: |
- |
الحد الأدني للطلب: |
1 Set |
تفاصيل التغليف: |
FOB |
موعد التسليم: |
within 2 months |
القدرة على التوريد: |
1000 Set per Year |
نوع الدفع: |
Other, PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T |
مجموعة المنتج : |
- |