سعر فوب
أحصل على آخر سعر300000 ~ 3e+06 / Set ( Negotiable )
|1 Set Minimum Order
بلد:
China
نموذج رقم:
Rudder-world
سعر فوب:
300000 ~ 3e+06 / Set ( Negotiable )أحصل على آخر سعر
الموقع:
-
سعر الحد الأدنى للطلب:
300000 per Set
الحد الأدني للطلب:
1 Set
تفاصيل التغليف:
wooden case or as consumer
موعد التسليم:
3 months after prepayment
القدرة على التوريد:
10 Set per Year
نوع الدفع:
L/C, T/T
مجموعة المنتج :
الشخص الذي يمكن الاتصال به Ms. Julia
Lingang No.2 Road, Zhoushan, Zhejiang
Steel pipe thermal insulation anticorrosion equipment
PU thermal insulation
equipment
The thermal insulation
equipment is mainly used to coat thermal layer and anticorrosion
layer on pipe external surface. Our company has three ways:
pipe-in-pipe, one-step method and coating method. One step
methodpossesses
such advantages as continuous working, high productivity, low cost,
energy saving, pollution free etc.
PU thermal insulation
pipes offer low thermal conductivity, good bending properties, high
mechanical resistance and waterproof characteristics. Combined with
an anticorrosion layer, polyurethanes can be solid, foam (PUF),
syntactic (SPU), or glass syntactic (GSPU), and are applied by
injection moulding, rotational casting or by PU half-shells. They
are suitable for offshore field joint coating operations and
reeling, J-lay and S-lay installations.
PP thermal
insulation equipment
PP thermal insulation
equipmentis
mainly used to coat thermal layer and anticorrosion layer on pipe
external surface.Multi-layer anticorrosion systems
are designed and applied in a wide range of thicknesses and layers
to meet insulation and subsea installation requirements. Pipe
coating is achieved by advanced PP extruder. It is an ideal choice for shallow
and deep water pipe coating &
transportation,J-lay
and S-lay installation.
بلد: | China |
نموذج رقم: | Rudder-world |
سعر فوب: | 300000 ~ 3e+06 / Set ( Negotiable ) أحصل على آخر سعر |
الموقع: | - |
سعر الحد الأدنى للطلب: | 300000 per Set |
الحد الأدني للطلب: | 1 Set |
تفاصيل التغليف: | wooden case or as consumer |
موعد التسليم: | 3 months after prepayment |
القدرة على التوريد: | 10 Set per Year |
نوع الدفع: | L/C, T/T |
مجموعة المنتج : | pipe external coating |